CASE Studies / various projects

china

Location: Bailu Zhou Bridge, Xiamen City, Fujian Province
Scope: 600 meters of DN500 pipeline at 1.6Mpa operating pressure, including four bends within 10 meters at one end and two 45˚ bends at the other end.

Location: Gongbei Water Plant, Zhuhai City, Guangdong Province
Scope: 120 meters of DN300 pipeline at 1.2Mpa operating pressure. The installation was successfully completed despite limited installation space.

Location: Baoding City, Hebei Province
Scope: 130 meters of DN300 pipeline at 1.2Mpa operating pressure. The project was completed successfully within a confined installation space.

Location: Shanghai, China
Scope: 355 meters of DN400 pipeline at 65˚C.

Location: Jiangsu, China
Scope: 255 meters of DN150 pipeline at 65˚C.

Location: Tianjin, China
Scope: 155 meters of DN200 pipeline at 65˚C.

Location: Tianjin, China
Scope: 185 meters of DN400 pipeline at 65˚C.

Location: Xinjiang, China
Scope: 154 meters of DN100 pipeline at 65˚C.

Location: Xinjiang, China
Scope: 585 meters of DN100 pipeline at 65˚C.

Location: Xinjiang, China
Scope: 565 meters of DN75 pipeline at 65˚C.

Location: Xinjiang, China
Scope: 153 meters of DN150 pipeline at 65˚C.

Location: Xinjiang Tahe Oilfield (Petro China), China
Scope: 2500 meters of DN800 wastewater pipeline at ambient temperatures.

Location: Xinjiang, China
Scope: 560 meters of DN300 pipeline at 80˚C.

Location: Xinjiang, China
Scope: 15,000 meters (19 coils) of DN250 pipeline at 80˚C.

Location: Daqing Oil Field, China
Scope: 4000 meters of DN80-250 pipeline for crude oil transportation at 70-90˚C.

Location: PCOC (Petro China), China
Scope: 2500 meters of DN65 pipeline for crude oil transportation at 70-90˚C.

Location: SINOPEC, China
Scope: 2500 meters of DN800 pipeline for crude oil transportation at ambient temperatures.

Location: Mianyang City, Sichuan Province
Scope: 450 meters / 200 meters of DN200 pipeline at 1.0Mpa operating pressure, located under a large lake

 

Location: Fushun City, Liaoning Province
Scope: 170 meters of DN400 pipeline at 1.2Mpa operating pressure. The installation was successfully completed in a narrow space.

Location: Chongqin, China
Scope: 135 meters of DN150 pipeline for gas transportation at ambient temperatures.

Location: Liaoning, China
Scope: 45 meters of DN150 pipeline for gas transportation at ambient temperatures.

Location: Tianjin, China
Scope: 450 meters of DN400 pipeline for gas transportation at ambient temperatures.

At PDVSA in Venezuela – 660 meters of DN100 liner was installed for the transportation of Oil at ambient temperatures.