HOT WATER LINER SOLUTION

Trenchless Rehabilitation on Pressure Pipes

The Hot Water Liner Solution is used to rehabilitate the following:

  • Municipal district heating
  • Snow & ice-melting pipes
  • Power generation plants
  • Manufacturing & industry
  • Food processing
  • Chemical plants
  • Agriculture

TECHNICAL SPECIFICATIONS

  • TRENCHLESS SOLUTION TYPE:                         Semi-structural pipe rehabilitation
  • ID OF HOST PIPE:                                              DN 50mm –  DN 600mm
  • MAX LENGTH OF EACH INSTALLATION:           Depends on diameter
  • MAX OPERATING PRESSURE:                             1 – 4 Mpa (10 – 40 bar)              
  • MAX BURSTING PRESSURE:                               3 – 12 Mpa (30 – 120 bar)
  • TEMPERATURE OF MEDIUM:                            40º C – 125º C (104°F – 257°F)
  • INSTALLATION MODE:                                        Pull in U-shape liners
  • ABRASION RESISTANCE:                                     Tailored to specific application
  • WALL THICKNESS:                                              6mm – 8mm
  • PULLING SPEED:                                                 Up to 400m/h
  • SERVICE LIFE:                                                      40 years
  • RAW MATERIALS:                                                High tenacity fabric reinforced layer (Aramid), Heat resistant PUX cover, Heat resistant PUX tube

DIAMETER OF LINER

Our Water Liner ranges from DN 50mm – DN 600mm

WE CAN MAKE UP THE ID TO YOUR EXACT SPECIFICATIONS